Tools Menu
Show Selected Compounds/Mappings
Compare/Fit...
The Compare/Fit command performs a geometric comparison of pairs of compounds and/or hypotheses. The type of comparison performed depends upon the types of objects selected, as outlined below. If you want detailed information about a particular type of Compare/Fit operation, select a blue topic:
Score Hypothesis
Provides estimated activities for a set of lead compounds in a spreadsheet based upon a selected hypothesis and evaluates how well the hypothesis fits the activity data. To use the Score Hypothesis command:
An estimated activity for each compound is displayed the Est column, and the ratio between the estimated and tested activity in the Error column.
The functions used by default in hypothesis generation are the same as those in the Feature Dictionary available for constructing hypotheses manually:
Initially, you must bring all of your lead set compounds into Catalyst, generate a conformational model for each one, then prepare an input spreadsheet using the tabular report in the Generate Hypothesis workbench. You must enter their tested activity values in the report, and modify the default uncertainty value, if desired, and save the spreadsheet. Select Generate Hypothesis and the dialog box is displayed.
Regress Hypothesis...
This command allows a manually constructed hypothesis to be used to estimate the activities of related molecules. Regress Hypothesis takes a tabular report with a training set and their activities, and a hypothesis, computes a linear structure-activity regression equation, and stores the regression information in a new local hypothesis. The local hypothesis then can be saved to the shelf. Regress automatically runs Score on the newly-produced local hypothesis, showing results in the report and the History Window, and displaying the regression graph.
Note that any changed values are displayed on a grayed background to indicate that the changes have not been committed to the StockroomDB.
In the Error column, the ratio of tested/estimated activity is displayed with a negative sign if the tested activity is higher than estimated. The Error column displays the ratio of estimated/tested activity with a positive sign if the estimated activity is higher than the tested activity. For example, if Score displays an Error of -1.57 for a compound, the tested activity is 57% lower than the activity estimated with the hypothesis.
An Xgraph is displayed showing the regression relationship of estimated activity with tested activity for the lead set.
The Sort By Property dialog box is displayed, with a list of properties that can be used to sort the tabular report entries. Use the scroll bar at the right of the list to see properties that are not visible.
The border of the selected property is highlighted.
1, 2, 3, 4... sorts entries in normal ascending order
Select the OK button to start sorting and dismiss the dialog box.
The entries in the tabular report are reordered according to the Property and Direction selected.
Show Selected Compounds/Mappings
When you have a hypothesis selected in the workspace and a number of related compounds in the spreadsheet, you can perform quick mapping operations that overlay one or more of the molecules on the hypothesis in the 3D workspace. Each compound is color coded to distinguish it from others and is mapped to the current hypothesis, using a fast fit of the optimum conformer. An estimated activity is displayed in the Status Area. To do a quick compare/fit:
For more information, see "To Display, Delete, Register, and Unregister Individual Conformers."